OPTIMIZATION OF PROCESSES FROM THE BEGINNING
Continuous Flow, Sustainable Management
- NEW FACTORY / LAYOUT PLANNING
Factory layout planning is an important element for ensuring continuous product flow and reaching customers on time. A successful factory layout designed according to lean principles can prevent production fluctuations and significantly increase plant efficiency and production flexibility.
If the layout plans are created away from the flow principle, this issue can be a constant bottleneck for facilities such as production and storage. Before creating the layout plan of the facilities, the ideal flow of the product and the future strategies of the enterprise should be taken into consideration. The facility flow plan should be prepared with minimum movement and minimum transportation target.
At this point, we form the basis of the operational excellence studies to be carried out in the future by supporting the relocation and resettlement planning processes of the enterprises that want to produce with Lean flow, aim to carry their processes to perfection, and optimize the factory and facility usage areas as a strategy.
- CONSIDERATIONS WHEN CREATING A SETTLEMENT PLAN
- Establishment of the Continuous Flow Principle
- Identifying the business clusters that constitute the Core Value
- Elimination of factors that cause movement waste
- Elimination of imbalances that will cause unnecessary stock build-up
- Determining the minimum space requirement for value-added production
- Determining the shortest routes for material flow and feeding