Gemba Partner
Automatic filling line at a chemical and detergent production facility

CHEMICALS

Strength in Uncertainty, Revenue from Efficiency

Don't let energy, raw material and capacity losses determine your production costs. Let's analyze your operation together, from equipment performance to process losses, and reveal your improvement potential.

OUR SECTOR-SPECIFIC REFERENCES

Companies We Are a Solution Partner To

We work side by side on the shop floor with chemical, cosmetics and cleaning product manufacturers.

Colgate-Palmolive logo
Eyüp Sabri Tuncer logo
AkzoNobel logo
Alkim Kimya logo
Beyaz Kağıt logo
Hayat Kimya logo
Organik Kimya logo
See all our references →

Volatile raw material and energy costs, unpredictable demand cycles and tightening regulations are pushing chemical manufacturers to get more yield out of their existing plants.

OUR VIEW OF THE SECTOR

Variability Management Matters in the Chemical Sector

As Gemba Partner, we address the production system end to end, from equipment effectiveness (OEE) to product changeovers, from maintenance systems to flow between processes and daily shop floor management.

We make losses visible in batch and continuous processes, shorten product changeover times, and put planned and autonomous maintenance systems in place. By turning experienced operators' knowledge into standards we prevent knowledge loss. To sustain quality, we apply methods that bring variation in operations under control.

Before a new investment, the first question: "What percentage of its real capacity is our plant running at?"

The goal is to build an operation that runs safer, more stable and more profitably with fewer resources.

Gemba Partner consultant and the customer team reviewing the control form together on the production floor
GET EXPERT ADVICE ON THIS TOPIC Schedule a free assessment call tailored to your shop floor.
Gemba Partner team reviewing process maps and daily management boards on the shop floor
RESULTS

Real Results Achieved at Our Customers

We turn the operational excellence and production system development work we do on the shop floor into measurable results.

25% OEE Increase*
40% Reduction in Product Changeover Time*
15% Maintenance Cost Savings*
90 daysMeasurable result
6–12 monthsTotal project duration
3–4 monthsAverage ROI
PROVEN SUCCESS STORIES

Real Results from Shop-Floor Experience

CHEMICALS · EQUIPMENT RELIABILITYROI 2 Months

40% Reduction in Critical Machine Downtime

Root causes of unplanned stops were analyzed; preventive maintenance, operator checks and critical equipment standards were restructured. Production continuity and equipment reliability were increased.

Unplanned Downtime−40%
MTBF+35%
Explore the related service →
FOOD PRODUCTION · HIGH-SPEED FILLINGROI 2 Months

OEE from 62% to 80% on a High-Speed Filling Line

Micro-stops, speed losses and setup problems were analyzed on the shop floor. By improving equipment parameters and work standards, additional capacity was created on the existing line.

OEE62% → 80%
Additional Capacity+7 Days/Month
Explore the related service →
PACKAGING · PRODUCTION LINEROI 2 Months

35% Increase in Line Speed

Bottlenecks, micro-stops and speed losses on the production line were analyzed. By improving process parameters and working standards, the capacity of the existing line was increased without investing in new equipment.

Line Speed+35%
Production Capacity+30%
Explore the related service →
PACKAGING · PRINTING PROCESSESROI 1 Month

80% Improvement in Printing Setup Times

The product changeover process was analyzed step by step with the SMED approach. Internal and external setup activities were separated, and preparation, adjustment and commissioning operations were standardized.

Setup Time−80%
Usable Capacity+25%
Explore the related service →
DEFENSE INDUSTRY · MACHININGROI 3 Months

40% Improvement in Equipment Availability

Downtime, waiting and capacity losses in machining processes were analyzed. Actions on bottleneck equipment achieved higher production capacity from the existing machine park.

Availability+40%
Additional Capacity+25%
Explore the related service →
OUR SERVICES

Our Services That Drive the Transformation

From Operational Excellence and Lean Transformation to digital shop floor management, from factory layout to capacity development, we address your production system end to end.

Gemba Partner
Automatic filling line at a chemical and detergent production facility
CHEMICALS

Strength in Uncertainty, Revenue from Efficiency

Don't let energy, raw material and capacity losses determine your production costs. Let's analyze your operation together, from equipment performance to process losses, and reveal your improvement potential.

Request a discovery call
OUR SECTOR-SPECIFIC REFERENCES

Companies We Are a Solution Partner To

We work side by side on the shop floor with chemical, cosmetics and cleaning product manufacturers.

Colgate-Palmolive logo
Eyüp Sabri Tuncer logo
AkzoNobel logo
Alkim Kimya logo
Beyaz Kağıt logo
Hayat Kimya logo
Organik Kimya logo
See all our references →

Volatile raw material and energy costs, unpredictable demand cycles and tightening regulations are pushing chemical manufacturers to get more yield out of their existing plants.

OUR VIEW OF THE SECTOR

Variability Management Matters in the Chemical Sector

As Gemba Partner, we address the production system end to end, from equipment effectiveness (OEE) to product changeovers, from maintenance systems to flow between processes and daily shop floor management.

We make losses visible in batch and continuous processes, shorten product changeover times, and put planned and autonomous maintenance systems in place. By turning experienced operators' knowledge into standards we prevent knowledge loss. To sustain quality, we apply methods that bring variation in operations under control.

Before a new investment, the first question: "What percentage of its real capacity is our plant running at?"

The goal is to build an operation that runs safer, more stable and more profitably with fewer resources.

Gemba Partner consultant and the customer team reviewing the control form together on the production floor
GET EXPERT ADVICE ON THIS TOPIC Schedule a free assessment call tailored to your shop floor.
Gemba Partner team reviewing process maps and daily management boards on the shop floor
RESULTS

Real Results Achieved at Our Customers

We turn the operational excellence and production system development work we do on the shop floor into measurable results.

25% OEE Increase*
40% Reduction in Product Changeover Time*
15% Maintenance Cost Savings*
90 daysMeasurable result
6–12 monthsTotal project duration
3–4 monthsAverage ROI
PROVEN SUCCESS STORIES

Real Results from Shop-Floor Experience

CHEMICALS · EQUIPMENT RELIABILITYROI 2 Months

40% Reduction in Critical Machine Downtime

Root causes of unplanned stops were analyzed; preventive maintenance, operator checks and critical equipment standards were restructured. Production continuity and equipment reliability were increased.

Unplanned Downtime−40%
MTBF+35%
Explore the related service →
FOOD PRODUCTION · HIGH-SPEED FILLINGROI 2 Months

OEE from 62% to 80% on a High-Speed Filling Line

Micro-stops, speed losses and setup problems were analyzed on the shop floor. By improving equipment parameters and work standards, additional capacity was created on the existing line.

OEE62% → 80%
Additional Capacity+7 Days/Month
Explore the related service →
PACKAGING · PRODUCTION LINEROI 2 Months

35% Increase in Line Speed

Bottlenecks, micro-stops and speed losses on the production line were analyzed. By improving process parameters and working standards, the capacity of the existing line was increased without investing in new equipment.

Line Speed+35%
Production Capacity+30%
Explore the related service →
PACKAGING · PRINTING PROCESSESROI 1 Month

80% Improvement in Printing Setup Times

The product changeover process was analyzed step by step with the SMED approach. Internal and external setup activities were separated, and preparation, adjustment and commissioning operations were standardized.

Setup Time−80%
Usable Capacity+25%
Explore the related service →
DEFENSE INDUSTRY · MACHININGROI 3 Months

40% Improvement in Equipment Availability

Downtime, waiting and capacity losses in machining processes were analyzed. Actions on bottleneck equipment achieved higher production capacity from the existing machine park.

Availability+40%
Additional Capacity+25%
Explore the related service →
OUR SERVICES

Our Services That Drive the Transformation

From Operational Excellence and Lean Transformation to digital shop floor management, from factory layout to capacity development, we address your production system end to end.