Gemba Partner
Operators in hygiene clothing and a packaging line at a food production facility

FOOD & AGRICULTURE

Safe, Efficient and Flexible Production

To meet changing demand, producing more is not enough; lines must run at the right speed, scrap must be kept under control and quality must be protected in every cycle. Let's analyze your production flow together and reveal the losses limiting your capacity and your improvement potential.

OUR SECTOR-SPECIFIC REFERENCES

Companies We Are a Solution Partner To

We work side by side on the shop floor with food, beverage and agricultural product manufacturers.

Başak Gıda logo
Tadım logo
Ahenk logo
Döhler logo
Feast logo
Bimbo QSR logo
Saray Bisküvi logo
SEK logo
Socotab logo
TAT logo
Cake Studio logo
See all our references →

Rising raw material costs, cost pressure that cannot be passed on to prices at the same speed, supply chain disruptions and tightening food safety requirements expect food manufacturers to work fast, error-free and at lower cost, all at once.

OUR VIEW OF THE SECTOR

Flexibility and Efficiency Matter in the Food Sector

As Gemba Partner, we address the production system end to end, from line efficiency to product changeovers, from cleaning and hygiene processes to warehouse and shipment flow and daily shop floor management.

We make breakdown and stoppage losses visible on filling and packaging lines, shorten product and format changeover times, and reduce scrap and waste. We enable fast launch of new products on the line, and secure quality and food safety on the shop floor with standard work and visual management systems.

The goal is to build an operation that meets demand on time, without loss and safely, whatever the season brings.

Gemba Partner consultant and the customer team reviewing the control form together on the production floor
GET EXPERT ADVICE ON THIS TOPIC Schedule a free assessment call tailored to your shop floor.
Gemba Partner TPM work on a food and agriculture production line
RESULTS

Real Results Achieved at Our Customers

We turn the operational excellence and production system development work we do on the shop floor into measurable results.

25% OEE Increase*
50% Man-Hour Productivity Gain*
25% Reduction in Scrap and Waste*
90 daysMeasurable result
6–9 monthsTotal project duration
2 monthsAverage ROI
PROVEN SUCCESS STORIES

Real Results from Shop-Floor Experience

FOOD · SANITATIONROI 2 Months

35% Reduction in Sanitation Time

End-of-shift sanitation time was reduced from 4 hours to 2.5 hours.

Unplanned Downtime−35%
Setup Average−30%
Explore the related service →
FOOD PRODUCTION · HIGH-SPEED FILLINGROI 2 Months

OEE from 62% to 80% on a High-Speed Filling Line

Micro-stops, speed losses and setup problems were analyzed on the shop floor. By improving equipment parameters and work standards, additional capacity was created on the existing line.

OEE62% → 80%
Additional Capacity+7 Days/Month
Explore the related service →
PACKAGING · PRODUCTION LINEROI 2 Months

35% Increase in Line Speed

Bottlenecks, micro-stops and speed losses on the production line were analyzed. By improving process parameters and working standards, the capacity of the existing line was increased without investing in new equipment.

Line Speed+35%
Production Capacity+30%
Explore the related service →
PACKAGING · PRINTING PROCESSESROI 1 Month

80% Improvement in Printing Setup Times

The product changeover process was analyzed step by step with the SMED approach. Internal and external setup activities were separated, and preparation, adjustment and commissioning operations were standardized.

Setup Time−80%
Usable Capacity+25%
Explore the related service →
CHEMICALS · EQUIPMENT RELIABILITYROI 2 Months

40% Reduction in Critical Machine Downtime

Root causes of unplanned stops were analyzed; preventive maintenance, operator checks and critical equipment standards were restructured. Production continuity and equipment reliability were increased.

Unplanned Downtime−40%
MTBF+35%
Explore the related service →
DURABLE CONSUMER GOODS · PAINT SHOPROI 1 Month

100% Increase in Paint Shop Efficiency

Downtime, speed and capacity losses in the paint shop process were analyzed. By eliminating bottlenecks and improving working standards, output from existing equipment was doubled.

Production Efficiency+100%
OEE+40%
Explore the related service →
OUR SERVICES

Our Services That Drive the Transformation

From Operational Excellence and Lean Transformation to digital shop floor management, from factory layout to capacity development, we address your production system end to end.

Gemba Partner
Operators in hygiene clothing and a packaging line at a food production facility
FOOD & AGRICULTURE

Safe, Efficient and Flexible Production

To meet changing demand, producing more is not enough; lines must run at the right speed, scrap must be kept under control and quality must be protected in every cycle. Let's analyze your production flow together and reveal the losses limiting your capacity and your improvement potential.

Request a discovery call
OUR SECTOR-SPECIFIC REFERENCES

Companies We Are a Solution Partner To

We work side by side on the shop floor with food, beverage and agricultural product manufacturers.

Başak Gıda logo
Tadım logo
Ahenk logo
Döhler logo
Feast logo
Bimbo QSR logo
Saray Bisküvi logo
SEK logo
Socotab logo
TAT logo
Cake Studio logo
See all our references →

Rising raw material costs, cost pressure that cannot be passed on to prices at the same speed, supply chain disruptions and tightening food safety requirements expect food manufacturers to work fast, error-free and at lower cost, all at once.

OUR VIEW OF THE SECTOR

Flexibility and Efficiency Matter in the Food Sector

As Gemba Partner, we address the production system end to end, from line efficiency to product changeovers, from cleaning and hygiene processes to warehouse and shipment flow and daily shop floor management.

We make breakdown and stoppage losses visible on filling and packaging lines, shorten product and format changeover times, and reduce scrap and waste. We enable fast launch of new products on the line, and secure quality and food safety on the shop floor with standard work and visual management systems.

The goal is to build an operation that meets demand on time, without loss and safely, whatever the season brings.

Gemba Partner consultant and the customer team reviewing the control form together on the production floor
GET EXPERT ADVICE ON THIS TOPIC Schedule a free assessment call tailored to your shop floor.
Gemba Partner TPM work on a food and agriculture production line
RESULTS

Real Results Achieved at Our Customers

We turn the operational excellence and production system development work we do on the shop floor into measurable results.

25% OEE Increase*
50% Man-Hour Productivity Gain*
25% Reduction in Scrap and Waste*
90 daysMeasurable result
6–9 monthsTotal project duration
2 monthsAverage ROI
PROVEN SUCCESS STORIES

Real Results from Shop-Floor Experience

FOOD · SANITATIONROI 2 Months

35% Reduction in Sanitation Time

End-of-shift sanitation time was reduced from 4 hours to 2.5 hours.

Unplanned Downtime−35%
Setup Average−30%
Explore the related service →
FOOD PRODUCTION · HIGH-SPEED FILLINGROI 2 Months

OEE from 62% to 80% on a High-Speed Filling Line

Micro-stops, speed losses and setup problems were analyzed on the shop floor. By improving equipment parameters and work standards, additional capacity was created on the existing line.

OEE62% → 80%
Additional Capacity+7 Days/Month
Explore the related service →
PACKAGING · PRODUCTION LINEROI 2 Months

35% Increase in Line Speed

Bottlenecks, micro-stops and speed losses on the production line were analyzed. By improving process parameters and working standards, the capacity of the existing line was increased without investing in new equipment.

Line Speed+35%
Production Capacity+30%
Explore the related service →
PACKAGING · PRINTING PROCESSESROI 1 Month

80% Improvement in Printing Setup Times

The product changeover process was analyzed step by step with the SMED approach. Internal and external setup activities were separated, and preparation, adjustment and commissioning operations were standardized.

Setup Time−80%
Usable Capacity+25%
Explore the related service →
CHEMICALS · EQUIPMENT RELIABILITYROI 2 Months

40% Reduction in Critical Machine Downtime

Root causes of unplanned stops were analyzed; preventive maintenance, operator checks and critical equipment standards were restructured. Production continuity and equipment reliability were increased.

Unplanned Downtime−40%
MTBF+35%
Explore the related service →
DURABLE CONSUMER GOODS · PAINT SHOPROI 1 Month

100% Increase in Paint Shop Efficiency

Downtime, speed and capacity losses in the paint shop process were analyzed. By eliminating bottlenecks and improving working standards, output from existing equipment was doubled.

Production Efficiency+100%
OEE+40%
Explore the related service →
OUR SERVICES

Our Services That Drive the Transformation

From Operational Excellence and Lean Transformation to digital shop floor management, from factory layout to capacity development, we address your production system end to end.