Gemba Partner
Gemba Partner team reviewing process maps and daily management boards on the shop floor

For an Efficient Production Floor, First Strong Shop Floor Management

Companies with strong management systems cannot maintain standards or achieve sustainable success if they cannot transfer the same strength to shop floor management

OPERATIONAL EXCELLENCE Lean Production TPM Shop Floor Management Systems Leadership Development Program
DEFINITION

What Is Shop Floor Management?

The main goal of every company is to survive despite changing market conditions and to build a sustainable presence. Although top management sets the general strategies and goals, the applicability of these strategies on the shop floor is of critical importance. Problems are minimized by clearly defining responsibilities at every level of the organization and integrating daily management tools into the shop floor.

The Shop Floor Management System aims to put the strategies set by top management into daily practice by giving responsibility to middle managers; with the PDCA (Plan-Do-Check-Act) cycle all parameters become traceable and losses are followed daily.

Gemba Partner team delivering standard work and risk anticipation training on the shop floor
GET EXPERT ADVICE ON THIS TOPIC Schedule a free assessment call tailored to your shop floor.
Gemba Partner team conducting a daily management assessment on the shop floor
RESULTS

In daily management in quality, cost and time.

+20% Productivity
-30% Quality Defect
-15% Lost Time

Making daily management produce results

With the shop floor management system, bring your goals down to the day, make losses visible and build a sustainable workshop management culture.

TRANSFORMATION STEPS

Toward Strong Shop Floor Management Together Step by Step

Our working concept brings daily management discipline to the shop floor in four main steps.

Request a discovery call →
1
Goals and Visual ManagementMain operational goals are set, visual management is integrated and the PDCA control routine is established.
2
Daily Management CultureA daily Kaizen culture, shop floor control parameters and a standard work structure are created.
3
Leadership and SystematicsLeadership duties are defined; Henkaten management and the PFUS routine are put into operation.
4
Production Control and Shop Floor OrderProduction control and tracking systems are set up; ergonomics, 5S and built-in quality practices are implemented.
OUR APPROACH

Daily Management Led by First-Level Managers

The Shop Floor Management System aims to put the strategies set by top management into daily practice by giving responsibility to middle managers. This way the process of reaching company goals is managed more effectively and efficiently.

By integrating tools such as visual management, standard work and Henkaten (detecting change) into your shop floor, we make the daily Kaizen culture lasting.

We don't offer ready-made recipes; together we build your own management system that works on the shop floor and delivers results.

Gemba Partner team setting up a production kanban and tracking system on the shop floor
PROVEN SUCCESS STORIES

Real Results from Shop-Floor Experience

ASSEMBLY · LINE BALANCINGROI 2 Months

35% Improvement in Cycle Time through Line Balancing

Station loads and operator movements were analyzed. The production rhythm of the line was balanced by redesigning bottleneck operations and applying standard work.

Cycle Time−35%
Additional Capacity+8 Days/Month
Explore the related service →
DURABLE CONSUMER GOODS · PAINT SHOPROI 1 Month

100% Increase in Paint Shop Efficiency

Downtime, speed and capacity losses in the paint shop process were analyzed. By eliminating bottlenecks and improving working standards, output from existing equipment was doubled.

Production Efficiency+100%
OEE+40%
Explore the related service →
INDUSTRIAL PRODUCTION · OPERATIONAL TRANSFORMATIONROI 1 Month

50% Increase in EBITDA through Operational Improvements

Workforce, capacity, shifts and production losses were addressed together. Reducing operating costs and improving resource utilization translated directly into financial results.

EBITDA+50%
Operating Cost−18%
Explore the related service →
BICYCLE MANUFACTURING · PRODUCTION CAPACITYROI 1 Month

60% Increase in Production Capacity through Flow Improvement

The production flow was redesigned with line balancing, bottleneck analysis and standard work activities. With the same resources, daily output was increased from 500 to 860 units.

Daily Output500 → 860 Units
Productivity+72%
Explore the related service →
PACKAGING · PRODUCTION LINEROI 2 Months

35% Increase in Line Speed

Bottlenecks, micro-stops and speed losses on the production line were analyzed. By improving process parameters and working standards, the capacity of the existing line was increased without investing in new equipment.

Line Speed+35%
Production Capacity+30%
Explore the related service →
OUR EXPERTS

Consult Our Experts Experienced in Shop Floor Management Systems

You can use the contact form to consult our experienced experts on shop floor management.

Go to the Contact Form
Gemba Partner expert consultant on the shop floor
FAQ

What people ask

How does it integrate with our existing management system?−
The system is built on top of your existing organizational structure; it adds daily management discipline rather than a new structure.
GEMBA BLOG

Notes from the Shop Floor and Expert Views

See all articles →
Gemba Partner shop-floor observation
VISUAL MANAGEMENT

What Is Visual Management in Companies?

Setting up boards and indicators that make the status visible at a glance on the shop floor.

Read more →
Gemba Digital main performance dashboard on the production floor
DIGITAL SHOP FLOOR

What Are Digital Shop Floor Management Programs?

The benefits of moving from paper-based tracking to digital shop floor management.

Read more →
Implementation and training session at the factory
LEAN MANUFACTURING

What Is Lean Manufacturing? 10 Major Benefits for Companies

The concrete gains lean manufacturing delivers when it goes hand in hand with shop floor management.

Read more →
FREE INTRODUCTORY MEETING

Ready to Unlock the Idle Capacity in Your Factory?

Our senior Gemba Partner consultants will carry out an on-site preliminary assessment at your facility, analyze your value stream and report your waste map and potential OEE gain projection.

A diagnostic report based on concrete shop-floor measurements, not assumptions.
ROI projection for the Board and Operations Directorate.
Zero commitment, protected by a full non-disclosure agreement (NDA).
+90 216 212 08 77/info@gembapartner.com

Request a Meeting

Your information is protected under KVKK and is never shared with third parties.
Gemba Partner
Gemba Partner team reviewing process maps and daily management boards on the shop floor

For an Efficient Production Floor, First Strong Shop Floor Management

Companies with strong management systems cannot maintain standards or achieve sustainable success if they cannot transfer the same strength to shop floor management

Request a discovery call
Lean Production TPM Shop Floor Management Systems Leadership Development Program
DEFINITION

What Is Shop Floor Management?

The main goal of every company is to survive despite changing market conditions and to build a sustainable presence. Although top management sets the general strategies and goals, the applicability of these strategies on the shop floor is of critical importance. Problems are minimized by clearly defining responsibilities at every level of the organization and integrating daily management tools into the shop floor.

The Shop Floor Management System aims to put the strategies set by top management into daily practice by giving responsibility to middle managers; with the PDCA (Plan-Do-Check-Act) cycle all parameters become traceable and losses are followed daily.

Gemba Partner team delivering standard work and risk anticipation training on the shop floor
GET EXPERT ADVICE ON THIS TOPIC Schedule a free assessment call tailored to your shop floor.
Gemba Partner team conducting a daily management assessment on the shop floor
RESULTS

In daily management in quality, cost and time.

+20% Productivity
-30% Quality Defect
-15% Lost Time

Making daily management produce results

With the shop floor management system, bring your goals down to the day, make losses visible and build a sustainable workshop management culture.

TRANSFORMATION STEPS

Toward Strong Shop Floor Management Together Step by Step

Our working concept brings daily management discipline to the shop floor in four main steps.

Request a discovery call →
1
Goals and Visual ManagementMain operational goals are set, visual management is integrated and the PDCA control routine is established.
2
Daily Management CultureA daily Kaizen culture, shop floor control parameters and a standard work structure are created.
3
Leadership and SystematicsLeadership duties are defined; Henkaten management and the PFUS routine are put into operation.
4
Production Control and Shop Floor OrderProduction control and tracking systems are set up; ergonomics, 5S and built-in quality practices are implemented.
Gemba Partner team setting up a production kanban and tracking system on the shop floor
OUR APPROACH

Daily Management Led by First-Level Managers

The Shop Floor Management System aims to put the strategies set by top management into daily practice by giving responsibility to middle managers. This way the process of reaching company goals is managed more effectively and efficiently.

By integrating tools such as visual management, standard work and Henkaten (detecting change) into your shop floor, we make the daily Kaizen culture lasting.

We don't offer ready-made recipes; together we build your own management system that works on the shop floor and delivers results.

PROVEN SUCCESS STORIES

Real Results from Shop-Floor Experience

ASSEMBLY · LINE BALANCINGROI 2 Months

35% Improvement in Cycle Time through Line Balancing

Station loads and operator movements were analyzed. The production rhythm of the line was balanced by redesigning bottleneck operations and applying standard work.

Cycle Time−35%
Additional Capacity+8 Days/Month
Explore the related service →
DURABLE CONSUMER GOODS · PAINT SHOPROI 1 Month

100% Increase in Paint Shop Efficiency

Downtime, speed and capacity losses in the paint shop process were analyzed. By eliminating bottlenecks and improving working standards, output from existing equipment was doubled.

Production Efficiency+100%
OEE+40%
Explore the related service →
INDUSTRIAL PRODUCTION · OPERATIONAL TRANSFORMATIONROI 1 Month

50% Increase in EBITDA through Operational Improvements

Workforce, capacity, shifts and production losses were addressed together. Reducing operating costs and improving resource utilization translated directly into financial results.

EBITDA+50%
Operating Cost−18%
Explore the related service →
BICYCLE MANUFACTURING · PRODUCTION CAPACITYROI 1 Month

60% Increase in Production Capacity through Flow Improvement

The production flow was redesigned with line balancing, bottleneck analysis and standard work activities. With the same resources, daily output was increased from 500 to 860 units.

Daily Output500 → 860 Units
Productivity+72%
Explore the related service →
PACKAGING · PRODUCTION LINEROI 2 Months

35% Increase in Line Speed

Bottlenecks, micro-stops and speed losses on the production line were analyzed. By improving process parameters and working standards, the capacity of the existing line was increased without investing in new equipment.

Line Speed+35%
Production Capacity+30%
Explore the related service →
Gemba Partner expert consultant on the shop floor
OUR EXPERTS

Consult Our Experts Experienced in Shop Floor Management Systems

You can use the contact form to consult our experienced experts on shop floor management.

Go to the Contact Form
FAQ

What people ask

How does it integrate with our existing management system?−
The system is built on top of your existing organizational structure; it adds daily management discipline rather than a new structure.
GEMBA BLOG

Notes from the Shop Floor and Expert Views

FREE INTRODUCTORY MEETING

Ready to Unlock the Idle Capacity in Your Factory?

Our senior Gemba Partner consultants will carry out an on-site preliminary assessment at your facility, analyze your value stream and report your waste map and potential OEE gain projection.

A diagnostic report based on concrete shop-floor measurements, not assumptions.
ROI projection for the Board and Operations Directorate.
Zero commitment, protected by a full non-disclosure agreement (NDA).
+90 216 212 08 77info@gembapartner.com

Request a Meeting

Your information is protected under KVKK and is never shared with third parties.