Success story · Food

Not Breaking the Cold Chain, but Managing Time: OEE at 82% in Food Production

Lean transformation in frozen food and raw material production: OEE rose from 65% to 82%, lead time fell from 10 days to 4.5 days, and total costs dropped by 30%.

Lean production in the food sector and freezer capacity management

Real Results Achieved Together

The solution was not buying a new machine but finding the rhythm of the existing line: through equipment measurement, shop floor management and a freezer capacity strategy, the result went straight to the bottom line.

82%machine OEE (from 65%)
55%shorter lead time (from 10 days to 4.5 days)
30%reduction in total costs

Gains of the Transformation

  • Equipment utilization rate increased by 35%
  • A freezer capacity and energy strategy was established
  • Immediate problems began to be addressed on site and on time
  • Visual control and PDCA reduced the impact of problems

Starting point: the hidden face of losses in food production

In food production, especially in the frozen food and raw material segment, time means not only cash but also freshness and energy. Every equipment stoppage, longer sanitation time and inefficient freezer use directly erodes profitability. When we went down to the production floor, the biggest bottlenecks we encountered were usually equipment stoppages, sanitation (CIP/cleaning) times and packaging areas where production balance had not been established.

  • High energy cost: Freezers, the heart of production, running empty or at low capacity.
  • Long sanitation times: Cleaning during product changeovers could not be managed as “non-production time”.
  • Low OEE: Machine-based efficiency stuck in the 60–65% range.

Approach: finding the rhythm of the existing line

The solution was not buying a new machine, but finding the rhythm of the existing line. We applied the following steps in food production sites:

  • Proper measurement of equipment and efficiency tracking
  • Building a shop floor management culture; intervening in immediate problems on time and on site
  • Freezer capacity and energy strategy
  • Reviewing product workflows and eliminating unnecessary operations
  • Creating visual control and visual management areas, and reducing the impact of problems with PDCA
TPM, maintenance and team work in a food factory
In food, freshness is everything; efficiency is no different.

Results: the transformation scorecard

The lean strategies applied made a difference not on paper but directly on the balance sheet at the food production facility.

ParameterBeforeAfterImprovement
Machine OEE65%82%+26% efficiency
Lead time10 days4.5 days55% faster
Total costsBaseline-30%Savings
Equipment utilization rateBaseline+35%Capacity increase

If the freezers in your facility are also running empty or cleaning times are slowing down production, there is a great treasure lying there. We are ready to find that treasure at the Gemba, on the shop floor: beyond improving processes, we code efficiency into the DNA of the factory.

Shop floor meeting and visual management in a food production area

Request a quick diagnosis for your facility

Let us analyze your freezer capacity, equipment efficiency and sanitation times together; with the Competitiveness Quick Diagnosis, let us uncover your hidden capacity.

Request a quick diagnosis

Explore Our Other Success Stories

35%productivity increase
Industrial Products

35% productivity increase in industrial manufacturing

Four years of lean transformation: the same volume with a smaller workforce.

→
€98,000operational gain in 6 months
Automotive

€98,000 gain in 6 months at an automotive supplier

A lean leadership program made the existing WCM system effective on the shop floor.

→
50%reduction in WIP inventory
White Goods

Smart layout instead of a new building: 50% less WIP inventory

With a flow-based layout, 12 new machines were installed without an additional building investment.

→
39%warehouse capacity recovered
Retail

39% more capacity without enlarging the store warehouse

Product retrieval time in the store warehouse fell from 15 minutes to 5 minutes.

→
80%output increase with the same team
Bicycle Manufacturing

Shift output rose from 500 to 900 units with the same team

Line balancing and one-piece flow removed the need for additional staff.

→
70%reduction in WIP inventory
Construction Materials

We fit a 3-floor production facility into 2 floors and cut inventory by 70%

Continuous flow and Kanban raised operational efficiency by 40%.

→
76%OEE (up from 65%)
Defense Industry

OEE rose from 65% to 76% in the defense industry

SMED and WIP balancing paid back the investment in two months.

→
91.2%machine availability
Automotive · TPM

TPM lifted machine availability from 83% to 91.2%

Preventive and autonomous maintenance plus technical skills reduced equipment downtime.

→
27%daily shipment increase
Logistics

Shop floor management lifted daily shipments 27%

Shop floor management, 5S and vehicle traffic order paid back the investment in four months.

→
See all our success stories →