50% Increase in EBITDA through Operational Improvements
Workforce, capacity, shifts and production losses were addressed together. Reducing operating costs and improving resource utilization translated directly into financial results.
Using Experience as an Internal Resource
Full-time management removes the core problem of companies with quick solutions; we offer our own experience as a resource
Interim Management: Companies can temporarily assign external professional managers or specialists with expertise in the field as internal resources to meet their project management needs for a defined period. This approach is preferred when a company's own internal resources are insufficient, when a need for temporary leadership arises, or when expertise is required to complete specific projects quickly and effectively.
Interim Operations Management: Expertise and know-how transfer in project management is achieved not by providing consulting services but by giving full authority to the person or organization engaged to manage the entire process and bring the project into successful operation.

Companies facing insufficient resources and limited time in improvement projects can increase operating profit, launch new products quickly and shorten lead times by bringing skilled human resources specialized in different sectors into their organization.
An effective way to increase operating profitability: we temporarily make an experienced manager your internal resource.
Request a discovery call →Gemba Partner experts take a strategic role within the top management of the client organization to ensure successful execution of operational improvement projects. All reporting and activity plans are followed by senior managers experienced in the field and effectively presented to the top management team.
Our INsource management model targets concrete improvements across a wide range, from production performance, lead time and product changeover times, to quality and scrap costs, equipment layout and inventory levels, to staff competence and organizational problem-solving ability.
Workforce, capacity, shifts and production losses were addressed together. Reducing operating costs and improving resource utilization translated directly into financial results.
By redesigning production flow and process layout from scratch, operations were consolidated under one roof. The need for a new building investment was eliminated, while WIP and internal logistics movements were significantly reduced.
Inventory points between processes and the production flow were redesigned. With a pull system and a controlled WIP approach, the amount of semi-finished goods between processes was reduced, creating a faster and more visible production flow.
Station loads and operator movements were analyzed. The production rhythm of the line was balanced by redesigning bottleneck operations and applying standard work.
Downtime, speed and capacity losses in the paint shop process were analyzed. By eliminating bottlenecks and improving working standards, output from existing equipment was doubled.
Every project is carried out by our senior consultants working in person on the shop floor. Meet the team that turns years of shop-floor experience into concrete results.
See all our experts →
A short look at how lean thinking has developed on the shop floor, from the Toyota Production System to today.
Read more →
An introduction to digital management tools that make shop floor data visible in real time.
Read more →
How equipment effectiveness is measured and how it is used in shop floor decision-making.
Read more →Let our senior Gemba Partner managers sit on your top management team and manage your operational transformation end to end, regularly presenting reporting and activity plans to your top management team.
Full-time management removes the core problem of companies with quick solutions; we offer our own experience as a resource
Request a discovery callInterim Management: Companies can temporarily assign external professional managers or specialists with expertise in the field as internal resources to meet their project management needs for a defined period. This approach is preferred when a company's own internal resources are insufficient, when a need for temporary leadership arises, or when expertise is required to complete specific projects quickly and effectively.
Interim Operations Management: Expertise and know-how transfer in project management is achieved not by providing consulting services but by giving full authority to the person or organization engaged to manage the entire process and bring the project into successful operation.

Companies facing insufficient resources and limited time in improvement projects can increase operating profit, launch new products quickly and shorten lead times by bringing skilled human resources specialized in different sectors into their organization.
An effective way to increase operating profitability: we temporarily make an experienced manager your internal resource.
Request a discovery call →
Gemba Partner experts take a strategic role within the top management of the client organization to ensure successful execution of operational improvement projects. All reporting and activity plans are followed by senior managers experienced in the field and effectively presented to the top management team.
Our INsource management model targets concrete improvements across a wide range, from production performance, lead time and product changeover times, to quality and scrap costs, equipment layout and inventory levels, to staff competence and organizational problem-solving ability.
Workforce, capacity, shifts and production losses were addressed together. Reducing operating costs and improving resource utilization translated directly into financial results.
By redesigning production flow and process layout from scratch, operations were consolidated under one roof. The need for a new building investment was eliminated, while WIP and internal logistics movements were significantly reduced.
Inventory points between processes and the production flow were redesigned. With a pull system and a controlled WIP approach, the amount of semi-finished goods between processes was reduced, creating a faster and more visible production flow.
Station loads and operator movements were analyzed. The production rhythm of the line was balanced by redesigning bottleneck operations and applying standard work.
Downtime, speed and capacity losses in the paint shop process were analyzed. By eliminating bottlenecks and improving working standards, output from existing equipment was doubled.
Every project is carried out by our senior consultants working in person on the shop floor. Meet the team that turns years of shop-floor experience into concrete results.
See all our experts →Let our senior Gemba Partner managers sit on your top management team and manage your operational transformation end to end, regularly presenting reporting and activity plans to your top management team.
Size en iyi deneyimi sunmak için çerez gibi teknolojiler kullanıyoruz. Bu teknolojilere onay vermeniz, sitede gezinme davranışı veya benzersiz kimlikler gibi verileri işlememize olanak tanır. Onay vermemeniz ya da onayınızı geri çekmeniz bazı özellik ve işlevleri olumsuz etkileyebilir.