Gemba Partner
Request a discovery call
Gemba Partner
Success story · Automotive

€98,000 Gain in 6 Months at an Automotive Supplier: Strong Shop Floor Leadership

At a German-origin global automotive supplier, a lean leadership program made the existing WCM system effective on the shop floor: €98,000 operational gain in six months and a payback period of 1.5 months.

Lean leadership fieldwork on an automotive supplier's injection molding production line

Real Results Achieved Together

At the end of the six-month lean leadership program, the company began managing its existing system more effectively on the shop floor without making new investments.

6 monthsProject duration
€98,000Project gain
1.5 monthsROI (payback period)

Gains of the Transformation

  • Daily shop floor management was standardized
  • Speed of responding to problems and taking action increased
  • PDCA became part of daily management
  • Shop floor teams’ participation in improvement grew stronger

Starting point: a strong system, shop floor management open to improvement

When shop floor leaders’ competencies have not reached the required level, losses show up not only in production and quality indicators. Delayed decisions, recurring problems and low employee engagement also directly affect operational performance and operating profitability. Our customer, a German-origin global automotive supplier, had a strong WCM infrastructure; however, the system’s execution on the shop floor, leadership behaviors and daily management discipline were not at the same level of maturity.

  • Recurring problems and prolonged stoppages
  • Delayed actions and non-standard practices
  • Low employee engagement and inefficient meetings
  • Missed improvement opportunities and slow decision-making

The root cause of the losses was less a technical shortcoming than the fact that shop floor leaders were not managing the existing system effectively enough.

The transformation: not a new system, but strong shop floor leadership

Instead of building a new management system, we focused on leadership behaviors that would strengthen the existing WCM infrastructure on the shop floor. The program was run in four key areas.

  • Applied lean leadership: Leaders developed their competencies by working on real shop floor problems.
  • Daily shop floor management: Line-based meetings and performance tracking were standardized.
  • PDCA discipline: Problems were not merely reported; they were analyzed, root causes were identified, and they were turned into actions and standardized.
  • Team engagement: Employees turned from people who do the work into team members who improve the process.

The leaders’ role also evolved from a manager who produces solutions alone into a shop floor coach who unlocks the potential of the team. This approach addresses leadership development, daily shop floor management and problem-solving coaching together.

WCM, Lean or OPEX systems do not produce results on their own; the results are produced by the leaders who keep these systems alive in every shift.
Shop floor management: a team holding a daily management meeting on the production line

Result: a lasting competitive advantage

At the end of the six-month implementation, an operational gain of €98,000 was achieved; the project’s return on investment (ROI) period was 1.5 months. These results were achieved without new machine investment, additional production space or additional staff.

A strong shop floor leader notices problems early, involves the team in the solution process, ensures standards are maintained and turns daily performance into an improvement opportunity. Technology and machines can be bought; however, a culture of continuous improvement cannot be sustained without strong shop floor leadership.

Shop floor team after the lean leadership program at an automotive supplier

Request a quick diagnosis for your facility

If you are not reaching your targeted results despite a strong WCM or OPEX infrastructure, the area for improvement may lie in your daily shop floor leadership system. With the Competitiveness Quick Diagnosis, let us analyze leadership, daily management and problem-solving discipline.

Request a quick diagnosis

Explore Our Other Success Stories

35%productivity increase
Industrial Products

35% productivity increase in industrial manufacturing

Four years of lean transformation: the same volume with a smaller workforce.

→
50%reduction in WIP inventory
White Goods

Smart layout instead of a new building: 50% less WIP inventory

With a flow-based layout, 12 new machines were installed without an additional building investment.

→
39%warehouse capacity recovered
Retail

39% more capacity without enlarging the store warehouse

Product retrieval time in the store warehouse fell from 15 minutes to 5 minutes.

→
82%OEE (up from 65%)
Food

OEE from 65% to 82% in food production

In frozen food production, lead time fell from 10 days to 4.5 days.

→
80%output increase with the same team
Bicycle Manufacturing

Shift output rose from 500 to 900 units with the same team

Line balancing and one-piece flow removed the need for additional staff.

→
70%reduction in WIP inventory
Construction Materials

We fit a 3-floor production facility into 2 floors and cut inventory by 70%

Continuous flow and Kanban raised operational efficiency by 40%.

→
76%OEE (up from 65%)
Defense Industry

OEE rose from 65% to 76% in the defense industry

SMED and WIP balancing paid back the investment in two months.

→
91.2%machine availability
Automotive · TPM

TPM lifted machine availability from 83% to 91.2%

Preventive and autonomous maintenance plus technical skills reduced equipment downtime.

→
27%daily shipment increase
Logistics

Shop floor management lifted daily shipments 27%

Shop floor management, 5S and vehicle traffic order paid back the investment in four months.

→
See all our success stories →